Cubic Yards to Truckloads

Understand how a project volume translates into estimated truckloads using an adjustable planning assumption.

Truckload planning starts with the volume basis and the assumed capacity. Use the table as a conversation starter, then confirm truck configuration, material, route, and site conditions for the actual scope.

Planning examples at 13 assumed cubic yards per load
Project volumeEstimated loads
10 CY1 loads
25 CY2 loads
50 CY4 loads
100 CY8 loads
250 CY20 loads
500 CY39 loads
1000 CY77 loads

The 13 CY figure is an estimating example only. Adjust the assumption with the Truck Loads Calculator.

A planning table, not a payload promise

The examples below use 13 cubic yards per assumed load. That figure is an estimating assumption only; trucks do not all carry the same legal or practical payload.

How to use the estimate

Divide the project’s cubic yards by the assumed yards per load and round up. The final load may be partial, and actual trips can change with moisture, density, swell, access, loading, and receiving conditions.

Questions contractors ask

How many loads is 100 cubic yards?

At a 13 CY planning assumption, 100 cubic yards rounds up to 8 estimated loads. Actual truck count and payload require project review.

Can I use this for compacted fill?

Use the volume basis carefully. Compacted, bank, and loose volumes can differ, so identify the basis before treating the result as a hauling plan.

From planning to scope

Ready to review the actual project?

Share quantities, material, access, destination, and schedule details for a useful conversation.

Start with the scope

Your next phase.
Let’s plan the dirt movement.

Haul-off. Haul-in. Project support.